Week 49Early December · ~5 min read · Ontario construction

Back to Ice & Snow: Winter Footing

↓ Download printable PDF

Black ice on a steel deck, a glazed ladder rung, a packed-snow path in from the truck — the footing turns on you right where you're about to put your weight. A few minutes of grit, cleats, and cleared paths at the start of the day keeps the whole crew upright, and somebody has to own it all shift.

The hazard

Black ice looks like wet pavement. Packed snow turns to glass under boots. Add a slope, stairs, a scaffold, or a load in your arms and a slip becomes a serious fall — and frozen ground gives you nothing soft to land on. The catch in December is that conditions change through the day: what was gritted at 7 a.m. is bare by noon and glazed again by four.

What to do

Watch out for

Talk it over